top of page
Engineering Feasibility Study for Kong Nga Po – Feasibility Study
缸瓦甫發展的工程可行性研究

Client: HKSAR Government Civil Engineering and Development Department (CEDD)


Status: Completed

The objectives of this Government (CEDD)'s feasibility study is to carry out an engineering study to ascertain the feasibility of and scope of developing the Kong Nga Po site for residential use upon the release of the land from the former Frontier Closed Area. One of the study's main objectives was to confirm the feasibility of implementing the development to meet the first land availability by 2020. KJL and OVA Studio were part of the multi-disciplinary team led by the leading consultant to provide planning and urban design input to review development parameters, initial indicative layout and access arrangement of the development. However, CEDD decided in January 2014 to stop the study due to re-thinking of the strategic studies for the formerly closed border area at the time.



客戶: 香港特別行政區政府土木工程拓展署


進度: 已完成

​​​

本屆政府(土木工程拓展署)可行性研究的目的是進行工程研究,以確定在將前邊境禁區釋出土地後,將其發展作住宅用途的可行性。 該研究的主要目標之一是確認能在 2020 年之前滿足第一批土地可用性的可行性。KJL 和 OVA Studio 是由主要顧問領導的團隊的一部分,提供規劃和城市設計意見,審查發展參數、初步佈局和無障礙設施。 然而,土木工程拓展署於 2014 年 1 月決定停止這項研究,原因是重新考慮當時對先前封閉的邊境地區的策略性研究。

bottom of page